返回列表 回復 發帖

rotary method and vertical steel tube

In a Portland cement manufacturing facility, the cement production has the subsequent a number of important stages:
The preparation of crude materials
The limestone is primary raw material of cement production, most factories close to the stone limestone quarry,cheap nike kobe shoes, to reduce transportation price as far as possible.
Via the demolition or the use flight loader have on the raw material (limestone, shale, silicious clay and yellow iron ore) extraction.
The uncooked materials was sent to the breaker,cheap nike shoes, stave or the hammer turns into the fragment there procedure.
Other limestones and raw materials typical include storage of squash,cheap kebo 8 shoes, to guard by the influence of outside link boundary, also might the greatest degree reduce the dust.
In most situations, or the impartial energy equipment that the quarry and cement plant meeting needs to separate.
The crude materials rubs
Rubs the workshop in the crude material, the uncooked materials is rubbed skinny, to guarantee higher-quality combine.
Utilized in this stage has stood rubs with the ball grinding, former utilizing pressure of drum leak via the materials ground, the latter, then the dependence metal ball carried on the attrition to the material.
Till now, the crude materials rubs to consume electrical power the vast majority not to be used stave
Material, but transforms the warmth energy reduction. Consequently here has one kind the need that melts after Jinan, hopes that can rub the workshop to modify to the crude materials, maintains the energy loss at as far as feasible the reduced level.
Uses 1 kind of optimized powder to rub procedure the electrical automated system is extremely essential.
The crude materials was transported finally to equalization dump website carries on the preserve and additional material mix.
Chamotte manufacturing
The diameter that the chamotte sphere agglomerates should in the .32-five.0cm scope, they create in the chemical reaction between raw supplies.
High-temperature therapy method such as three steps: Drying or preheating, calcine (a warmth treatment, creates quicklime in its process) as well as the roasting (agglutination).
The calcine is the hard core in this working process. The crude materials constantly weighing and sent in the pre-heater most crown's cyclone separator, the material risen hot air heating in pre-heater, in the huge rotary calciner, the uncooked materials transforms into the chamotte below 1450 Celsius.
The chamotte enters the hearth grate chilly device to have on the gas cooling and cooling from kiln. Cooled the ripe materials transmits the chamotte bunker to have on the storage with the disc conveyer belt afterward.
Following chamotte cooling,cheap air max, might take the transmission in the transportation, and might regenerate reaches thirty% quantity of heat. Provides is inducted the revolving furnace after the chamotte cooling air, it assists the gas burning. Usually type hearth grate Leng Jiwei the reciprocation stove plate-kind and planet and turn on lathe the transferring kind. Extremely rough dust that fire grate Leng Ji collects by the cement mineral constituent, it was recycled the restoration processing.
According to cooling temperature that the evaporation effectiveness and hope obtain, in the undercooling leads to with the air quantity roughly is 1-two kilograms/each kilogram chamotte. If following the undercooling, component of gas were used in other procedures, for instance the coal is dry, then might reduce the gasoline amount that needs to purify.
The chamotte storage power may consider based on the marketplace that a factory usually may store to save the chamotte yearly output five-twenty five%. Conveyer belt and bucket elevator and so on supposing prepares may be utilized carries on from hearth grate Leng Ji to the storage areas as well as the chamotte grinding devices the chamotte the transmission. The gravity whereabouts and transmission usually have to the dust collector's passing wind gear.
And reduced power consumption to reduced the overriding need of disappearing is to attain the revolving furnace revolution is well balanced. Therefore,cheap free run shoes, must use the modernized process manage technologies to the checking that the combustion process carries on to continue.
The storage and chamotte rub
The chamotte takes out from the chamotte bunker and delivers to the bunker, before getting into the chamotte rubs and additive with the gypsum carries on the allotted proportion mix.
In the chamotte powder rubbing process, the chamotte was ground to the fine dust with other raw supplies together, reaches the anhydrites of 5% gypsum or attachment is elevated, to manage Shui Ni the environment time, simultaneously joins also has other chemical compounds, the instance like is used to modify the fluid or the air content material chemical compound. Many factory use rolling kind damaged broken machine gains to be possible to reduce to the preliminary dimension chamotte and gypsum, these materials sent in the ball grinding afterward (rotary method and vertical metal tube, content steel alloy ball bearing) carry on the other powders to rub the processing.
The powder rubs the procedure in the loop system, this system provided a spatial disposition to leave the device, was utilized to independent the cement pellet in accordance to the size, the material material that has not degraded in size totally experienced been sent this method.
This Gao Nenghao's operating procedure requirements to automate and manage of optimization, to assure the present quality requirement.
Related articles:

  
   http://gxcy.gxnet.com/forum.php?mod=viewthread&tid=2962534
  
   http://diannaozhou.com/forum.php?mod=viewthread&tid=6001156
  
   http://ru.luckbeijing.com/forum.php?mod=viewthread&tid=5731348
返回列表